Contact
Réf. EN1212261246
Né le 11/04/1982
21000 Skikda
Algerie
1982-04-11
https://www.enginsjob.com/cv-candidat/1212261246/ingenieur-en-electromecanique
Male
Skikda
Toute la France
Algerie
21000
Skikda
Langues
Arabic mother tong./ French very good. / English good
Ma recherche
Je recherche tout type de contrat, sur la France et étranger, dans l'Ingénierie.
Formations
June 2008: diploma of state: Industrial Engineer in Electro mechanics, Skikda university
Expériences professionnelles
2011
QA/QC Welding engineer in (SNC LAVALIN International )
- Duration: from (July 2011- to till now)
- Project: installation of gas treatment for Rhourde Nouss fields ILLIZI
Duties:
• Responsible to witness PQR and WQT.
• Responsible on checking materials to be used in the fabrication shop.
• Responsible for dimensional check prior to welding.
• Responsible for visual inspection of welding.
• Familiar with ASME welding codes and NDT procedure / technologies.
• Prepare test Packages document prior to test.
2010
QA/QC piping in (ETB/MIK) (RED SEA)-(SAMSUNG ENGINEERING CO.LTD)
- Duration: from (December 2010- July 2011)
- Project: Construction of A/G Piping SKIKDA REFINERY REHABILITATION AND ADAPTATION PROJECT (SONATRACH ACTIVITE AVAL-DIVISION RAFFINAGE)
Duties:
• Responsible on checking materials to be used in the fabrication shop.
• Responsible for dimensional check prior to welding.
• Responsible for visual inspection of welding.
• Following up NDT process according to Project ITP'S.
2009
Duration: from (February 2009- December 2010)
- QA/QC piping in (ORASCOM CONSTRUCTION ) - (KBR) Algeria
- Project: Construction of Under Ground Piping Systems (Skikda New LNG Train)
Duties:
• Receiving Material , Reviewing Drawings
• Prepare (Test Packages , ITP's , WPS, PQR and WQT)
• Following up work shop fabrication and site Erection. By ensuring that all processes are matching with approved Procedures.
• Following up NDT process according to Project ITP'S.
• Following Up Hydrostatic test.
• Following Up Insulation, sandblast and Painting.
• Prepare the Final Documentation of the project ( Test Packages and Loops)
2003
August 2003- February 2009:
Globe transit:
• Declaring in customs:
Management of files import / export.
Prepare the statements (declarations) import and export on system.
Follow-up of files with the services of customs.
Langues
Arabic mother tong./ French very good. / English good